Corrective Action Recommendation for Material Management in Construction Project’s Cost Control

Empirical Research & Governance·Format: JOURNAL (Digital Article / Paper)·Published: 2024
Corrective Action Recommendation for Material Management in Construction Project’s Cost Control
Photo / Document Preview: Corrective Action Recommendation for Material Management in Construction Project’s Cost Control

Abstract

In construction project operation, often there is a project cost variance in terms of the material, equipments, manpower, subcontractor, overhead cost, and general condition. Material is the main component in construction projects. Therefore, if the material management is not properly managed it will create a project cost variance. Project cost can be controlled by taking corrective actions towards the cost variance. The objective of this research paper is to identify the main cause of the cost variance and to recommend the corrective actions. The approach to serve that objective is by conducting surveys to high rise building construction projects in order to identify the cause of project cost variance in material purchasing, and by interviewing experts in order to obtain recommendations in taking corrective actions. Method Analysis used in this research is Delphi method. The result of the research shows that the corrective action towards the variance of the material purchasing cost is actually a preventive action (before process).

Key Research Takeaways & Findings

Temuan empiris dan formulasi tata kelola proyek berbasis riset institusional.
Kerangka kerja implementasi praktis untuk mitigasi risiko dan akselerasi performa PMO.
Model evaluasi kapabilitas dan keselarasan strategi organisasi.

Citation Information

APA Format (7th Edition)
Veronika, A. (2024). Corrective Action Recommendation for Material Management in Construction Project’s Cost Control. PMO Institute Research & Whitepaper Series.
Harvard Format
Dr. Alin Veronika, MT, PMP / SCOPE Research, 2024. Corrective Action Recommendation for Material Management in Construction Project’s Cost Control. Jakarta: SCOPE Press.

Partner with SCOPE to Advance Organizational & Project Excellence

Let's turn evidence into impact.